Analisis sistem pertanahan penangkal petir gedung IRM P2TBDU BATAN
Sistem pentanahan penangkal petir yang terpasang di gedung IRM berfungsi untuk mengamankan gedung dari bahaya sambaran petir baik sambaran langsung maupun tidak langsung. Analisis dilakukan dengan cara mempelajari sistem yang terpasang, dokumen terkait, melakukan pengecekan di lapangan, pengukuran, dan perhitungan. Kemudian hasil-hasil tersebut dibandingkan dengan persyaratan yang ditentukan. Sistem pentanahan penangkal petir gedung IRM terdiri dari terminal udara (finial), konduktor hantaran turun (down conductor), dan elektroda pembumian yang berfungsi sebagai proteksi eksternal, sedangkan proteksi internal adalah batang penyama tegangan (Potential Equalizaton Bar-PEB). Besarnya nilai tahanan pentanahan hasil pengukuran dan perhitungan adalah 1,148 ohm dan 1,137 ohm. Nilai tersebut masih di bawah nilai tahanan pentanahan yang diizinkan (2 ohm). Ditemukan beberapa konektor kabel pentanahan mengalami kerusakan, hal ini memerlukan perbaikan agar sistem pentanahan penangkal petir dapat berfungsi secara optimal. Berdasarkan hasil pengamatan juga diketahui sistem penangkal petir belum dilengkapi dengan sistem proteksi internal yang memadia sehingga diperlukan tindak lanjut untuk penyempurnaan sistem proteksi internal.
The lightning arresting earthing system which is set up in the IRM building and the instruments within from the direct and inderect lightning. The analysis was conducted through studying the implemented system, related documents, direct investigation on the field, measurements, and calculation. The results obtained then were compared with the conditional requirements. The IRM lightning arresting earthing system consist of finial, down conductor, earthing conductor which works as an external protection, and potential equalization bar as an internal protection. The measurement and calculation results showed that the earting resistance are 1.148 ohm and 1.137 ohm, respectively. These values are still in the range of requirements (2 ohm). Moreover, it is found the some cable connectors were deteriorate, which need to be repaired so that the system could work optimally. From the observation results, it was found that the internal protection was not installed in lightning arresting system, therefore, need to be set up to establish the appropriate Lightning Arresting Earthing System.
S05-2132 | 7/TA/M/5 551.596.5(043) KUS a | Perpustakaan Poltek Nuklir | Tersedia |
Tidak tersedia versi lain