Tugas Akhir
Perhitungan penurunan tekanan pada sistem catu air pendingin IRM untuk berbagai kondisi operasi
Penggunaan sistem catu air pendingin sebagai sarana penunjang penelitian pada Instalasi Radiometalurgi (IRM) sangatlah penting untuk menjaga kondisi persyaratan peralatan proses di luar Hot Cell dan peralatan proses di Hot Cell. Dalam operasinya, sistem air pendingin tersebut jika dioperasikan secara bersamaan tekanan distribusi air pendingin tidak dapat terpenuhi sesuai kebutuhan. Untuk meningkatkan penggunaan operasi pada sistem catu air pendingin secara optimal pada fasilitas IRM perlu dilakukan penelitian untuk mengetahui pengaruh beban terpasang terhadap head pompa sirkulasi. Pengaruh beban tersebut di teliti melalui perhitungan dan pengujian, pada saat pengujian pengoperasian dijumpai adanya lonjakan tekanan dan penurunan tekanan pada saat melakukan pengoperasian peralatan proses secara bersamaan diakibatkan karena tidak berfungsinya Pressure Vessel PV.252. Hasil perhitungan head total pompa adalah 70,43596 mH2O lebih besar dari head total pompa terpasang adalah 65 mH2O. Oleh karena itu pompa disarankan diganti dengan head yang besar atau dengan solusi pengaturan pengoperasian peralatan proses. Untuk mengatasi lonjakan tekanan air pedingin membran pada PV.252 harus diganti dengan yang baru.
The use of the chilled water system as supporting of research activities at the Installation of Radiometalurgy (IRM) is important for maintaining the process equipment conditions inside or outside of the hot cell. As all process equipment were run at the same time, the pressure distribution of the chilled water system does not meet the requiremente according to their needs. There fore, the use of the IRM chilled water system should be optimalized by observing the effect of load requried to the pump head and by testing and operation. It was found that the pressure was up and down during the running of process equipment at the same time. This is happened because pressure vessel PV.252 does not function properly dur to leaharge of membrane. Calculation results show that the total pump head is 70,43596 mH2O, which is higher than nominal pump head 65 mH2O. It is suggested that the pump should be replaced by the higher head pump, or the use of process equipment should be rearranged. In addition, the membrane of PV.252 should be replaced with a new one to overcome the wave of the pressure of the chilled water.
S06-0537 | 13/TA/M/6 622.845(043) AHR p | Perpustakaan Poltek Nuklir | Tersedia |
Tidak tersedia versi lain